WHAT IS IT? | R&D | ADVANTAGES | HANDINESS | DOCUMENTATION | ENVIRONMENT | PRESS RELEASE | GALLERY | VIDEO | CONTACT | HOME | LOGIN

Instant and optimized

Also the application has been studied and optimized. Coverlite® is applied on the pavement surface preferably, but non necessarily, immediately after the pavement laying phase.
The product is applied through a patented spraying system equipment in regard of few and simple instructions. Above of all, Coverlite® is a simple and rapid application. It doesn't elongate the reopening of traffic time; all to the good for the viability and road construction site efficiency.

hot method, application during the paving phase and within the time required to realize the new infrastructure
cold method, on layers already realized after the preparation of the worksite and reopening to the traffic waiting the drying timing of the treatment.